Newton North High School
Newton, Massachusetts

EXTERIOR BUILDING ENVELOPE PEER REVIEW/CONSTRUCTION PERIOD SERVICES

The new Newton North High School is being built to replace the existing high school, which has been experiencing multiple moisture and air infiltration issues. In an effort to prevent these problems occurring in the new building, Turner Construction Company (Owner’s Construction Manager) hired Gale to perform peer reviews of the project specifications and drawings with a concentration on the building envelope including the exterior walls, roofs, windows, curtain walls, and doors. Gale’s services also included performing a dew point analysis utilizing the WUFI software program, mock-up review, and air and water infiltration testing. Gale is currently assisting Turner with full-time construction monitoring of the building envelope, managing coordination meetings with the contractors and subcontractors, and assisting the Architect with solving design issues raised in the field. 

[NEXT]

[BACK TO BUILDING ENVELOPE TECHNOLOGY]

 

Projects

Academic

College/University

Commercial

Department of Defense

Athletic and Recreational

Historic Buildings

Airports

Residential

Health Care

Municipal