|
Trinity College
Jesse/Miller Field
Hartford, Connecticut |
FIELD RENOVATION
Trinity College required replacement of the over-used
natural turf, multi-purpose field and resolution of
chronic drainage problems. Gale entered into the first
design-build "filled-turf" project as a subconsultant
to Field Turf vendor, Northeast Turf. We completed the
fast-track design-build project in 90 days from design
through construction, as required by Trinity. Gale also
performed base plan development with the GPS survey
system and devised innovative turf anchoring methods
within the existing track.
[NEXT]
|