A Systematic Approach to Evaluating the Building
Envelope
The New England Real Estate Journal
May 26, 2006
A major responsibility of building owners is to ensure that their buildings are as water-tight, energy-efficient, and safe as possible. This often means investigating and evaluating the building envelope (roof, walls, windows, waterproofing, and structure) to define and resolve existing problems as well as to eliminate future problems, thereby extending the service life of the building.
Research a Building’s History Before Determining its Future
Collect Historical Data
Historical data will help determine the original design intent, construction
variations, and recurring problem areas in the building. Historical information
includes:
• Design documents, specifications, and plans
• Codes and standards from time of construction
• Test reports on materials or systems
• Construction documents (i.e. change orders, etc.)
• Local practices or what was normally installed by contractors at that time and in that region
Determine the Original Design Intent
and Effectiveness
Considering the original design intent will help determine the cause of building
envelope problems. For example, investigating roof problems would include reviewing
the structural, thermal, drainage, and vapor drive to understand performance
requirements. In addition to the intent, the original design effectiveness should
be considered. Was this design appropriate for the building’s location?
Can it perform as intended? Is the building in a high-exposure area or protected?
Examine Your Building’s Service
History
A full understanding of how the building is servicing its occupants is important.
Occupant interviews regarding active leaks and draft locations, and maintenance
reports are valuable.
Perform a Field Inspection
The field inspection complements the data obtained from the service history and design documentation, and indicates variations between design and construction.
Access Methods
There are several access methods available to reach difficult wall/building
areas:
• Two-Man Ground Lifts - Can double as an observation and testing platform
• Swing Staging - Suitable for straight vertical drops with a flat building geometry
• Industrial Rope Access - Safely access structures by descending and ascending suspended ropes; inexpensive method of vertical access to perform evaluation and light test procedures.
Identifying the Defects
Proper defect identification will help determine necessary repairs, aid material
selection, and reveal influences contributing to deterioration. It is important
to note which factors have caused degradation of the building and its components
and how one deficiency and its intended repair may influence or amplify another.
Correlating the interior leak audit with exterior defects assists in determining
the cause of various problems as it narrows down the exterior testing areas.
It also helps owners prioritize repairs.
Testing Methods
The objective of field testing is to correlate paths of moisture infiltration. The most reliable way to test for moisture is to recreate the leakage in a controlled manner to verify source(s).
Non-Destructive Testing
Non-destructive testing uses a variety of non-invasive tools and causes little
or no damage to the building envelope.
• Rilem Tube - Adhered to exterior walls to determine the porosity of brick masonry unit construction.
• Water Spray Rack (ASTM E1105) - Simulates a wind-driven rain to verify moisture infiltration.
• Hose Spray Test (AAMA 501.2) - Simulates wind-driven rain in small areas using a standard garden hose in which a calibrated nozzle is attached with a pressure gauge.
• Differential Pressure Test (ASTM E1105) - A pressure chamber is constructed at an interior location to test moisture driven through a component under negative pressure.
• Infra-Red Thermography - Photographs the building exterior to determine locations of wet components.
• Soundings (ASTM D4580) - Tap a hammer on surface; a hollow sound indicates areas where the concrete has separated from the reinforcing steel. Another method of sounding is to drag a heavy link chain along a concrete surface to listen for hollow sounds.
• Pachometer Survey - Uses a magnetic device to locate embedded steel reinforcement and helps determine the concrete cover over the reinforcement.
• Polysheet Tapedown - Section of polyethylene is sealed to the concrete with duct tape and removed 24 hours later. If there is moisture beneath the polyethylene, there may be a vapor drive concern.
• Glass-Slide Epoxy or Crackometer - Sealed in place over a crack and periodically checked to determine if any movement has occurred (with movement, the glass will crack or the meter will record).
• Optical Illuminated Boroscope - Inserted into a pilot hole through an exterior wall, allowing cavity walls, stud wall backup of exterior insulated finish systems (EIFS), etc. to be observed.
• Smoke/Dust Tracer - Locates air infiltration (moved across a window’s interior face to observe smoke and dust particles coming through).
• Moisture Meter - A digital device that detects the presence of moisture.
• Flashlight and mirror - Placing the mirror behind difficult-to-access areas with the flashlight will allow observation of concealed conditions.
Destructive Testing
When the main objective is to determine the existing composition and configuration of concealed assembly conditions, destructive testing is warranted.
Roofs
Test cuts in the roof will determine the condition of the insulation and substrate.
Allows verification of roofing problems and resulting substrate conditions.
Test cuts will also expose the configurations of flashing components, etc.
Exterior Walls
For masonry walls, it is best to make test cuts at window heads and sills, and
other opening locations to expose defective through-wall flashing.
Gathering Samples for Laboratory Testing
Samples of sealants, coatings, roofing materials, etc. can be sent to a laboratory
to determine the presence of contaminants.
Laboratory Testing
Laboratory testing will determine existing material types, presence of contaminants,
and the possibility of hazardous components.
• Gravimetric Analysis - Determines moisture content.
• Asbestos and Lead - Allows owner to consider the remediation costs in the project budget.
• Petrography - Determines the “make-up” of concrete.
• Compression/Tension - Determines compressive strength and modulus of rupture for the concrete.
• Air Entrainment - Indicates concrete’s durability and freeze-thaw resistance.
• Presence of Carbonization - Indicates the depth that carbon dioxide has progressed into the concrete. Impacts the potential for embedded steel corrosion and spall repairs.
• Reinforcement Placement, Depth, Quantity, and Type - Determines required steel replacement and structural capacities.
A Thorough Evaluation = Long-Term Cost Savings
The time and expense to perform an initial, well-focused evaluation will save the building owner/manager money in the long run and result in repairs that extend the service life of an important asset: your building.
If you would like a copy of this article in its entirety,
please contact Jon Lindberg at 800-659-4753.