Gale planned, designed, and permitted a
43-acre industrial park subdivision. The
project included:
- Designing a four-lot park, including
roadway, utility, and stormwater infrastructure
- Acquiring subdivision approval for the
industrial park and a DEP sewer extension
permit
- Filing an Expanded Environmental Notification
Form and subsequent Single Environmental
Impact Report with MEPA, and filing a
Land Release Permit with the Federal Aviation
Administration
- Designing a 3.5-million gallon stormwater
detention/retention system, as well as
7,000+ feet of collection piping
- Designing a municipal sewer pump chamber
and 1,500+ feet of sewer force main, as
well as more than 3,000 feet of gravity
sewer collection piping
|